Irvine Slow-Roll Shower Door Install Kit – Silicone, Screws & Saw

SKU: ERVP-ISD-INSTALL-KIT
Added to catalog: November 12, 2026

Sale price$49.97
| Found it cheaper? Get an answer in seconds.
In stock at Elkhart RV Parts (4 units), ready to ship
Availability details
Elkhart RV Parts warehouse4 ready to ship
ERVP overstock warehouse0 available
This quantity is stocked at ERVP. See the delivery estimate below for the current expected window.
Delivery Estimate November 16 – November 19
1-Hour Cancellation Window

1-Hour Cancellation Window

You'll have 1 hour after placing your order to update your shipping address or cancel completely.

After that, we begin coordinating with our vendors to fulfill your order — at that point, cancellations and address changes usually aren't possible.

If you're unsure about anything, please reach out before ordering or cancel within the window.

Earn $0.99 in store creditAdded to your account when your order is delivered. Good for 90 days; sign in at checkout to use it.
Saved items

How it works · terms

As used by RV pros

Mobile RV techs and dealers who buy their parts here. Tap one to see their Google profile.

Gather the sealing, fastening and track-trimming supplies in one kit
Optional four-item install kit for the Irvine Slow-Roll shower door: clear 2.8-oz silicone, two labeled screw boxes and a 6-in track-trimming hacksaw. Door sold separately; bring a screwdriver and tape measure.
---

Irvine Slow-Roll Shower Door Install Kit

Have the silicone, two screw sizes and track-trimming saw together before you start your Irvine Slow-Roll shower door installation. This optional four-item kit puts the selected supplies in one box, with the fastener sizes matched to Irvine’s installation instructions.

Plan ahead for work at home, at a campsite or in the shop: the GE hand tube handles sealing, the Hillman screw boxes cover the cartridge and top-track fasteners, and the compact Project Source hacksaw trims the bottom track. Bring your screwdriver and tape measure. The shower door is sold separately.

What’s in the box

  • 1 × GE Advanced Silicone 2 Kitchen & Bath clear silicone, 2.8 oz. Hand tube for sealing the wall jambs and bottom threshold; no caulk gun needed.
  • 1 × Hillman #8 × 1-1/4 in. Phillips-drive standard-point sheet metal screws, 5-count box. The cartridge step uses two, leaving three spares.
  • 1 × Hillman #6 × 1/2 in. Phillips-drive standard-point sheet metal screws, 12-count box. The top-track/side-rail step uses one, leaving eleven spares.
  • 1 × Project Source 6-in Extra Fine Cut Hack Saw. For trimming the bottom track to the length specified by Irvine.

The four items retain their original labeled retail packaging. No loose bulk-screw substitution. Door, cartridge, tracks, screwdriver, tape measure and caulk gun are not included.

How the kit follows the installation

  1. Mount the cartridge with the #8 screws. Peel and stick the shower-screen cartridge to the shower wall jamb, then secure it through the endcap screw slots with two #8 × 1-1/4 in. screws.
  2. Trim the bottom track with the hacksaw. Measure the bottom of the shower opening. Cut the bottom track to the opening width minus 2-1/2 in., then insert it into the shower-screen endcap.
  3. Fit the side rail. Insert the bottom track into the side-rail endcap. Peel the backing and press the side rail onto the wall jamb as Irvine directs.
  4. Secure the top track with the #6 screw. Slide the leadrail carrier into the back of the top track, insert the track into the upper endcap, then press it into the side-rail endcap. Secure the top track and side rail with one #6 × 1/2 in. screw.
  5. Seal the jambs and threshold with silicone. Apply silicone inside and outside both wall jambs and along the bottom threshold. Follow the sealant label for surface preparation, application and curing.

Do not screw into the shower pan or threshold. The #8 screws secure the cartridge at the wall jamb; the #6 screw secures the top track and side rail. The bottom threshold is sealed with silicone.

Why choose this kit?

  • One kit to plan for: gather the selected sealing, fastening and cutting items under one SKU per door installation.
  • Exact screw sizes: separate labeled boxes make the cartridge screws and top-track screw easy to identify.
  • Spare screws included: each retail box contains more than the number used in Irvine’s illustrated steps.
  • Compact hand-tube sealant: the 2.8-oz tube does not require a caulk gun.
  • A useful tool afterward: keep the 6-in hacksaw with your RV tools after trimming the track.

Shipping

Ordered alone, this kit ships in a 7 × 7 × 10 inch box weighing 2 lb packed. Ordered alongside an Irvine shower door, it is packed inside the shower-door package.

Before you order

This is an optional installation-supply kit for the Irvine ISD RV Slow-Roll Shower Door sold by Elkhart RV Parts. It is a convenience assortment assembled by Elkhart RV Parts, not an Irvine-manufactured OEM hardware kit. The shower door does not include installation screws or silicone. Supply your own or add this kit. This kit does not establish compatibility with other shower doors.

Use the Irvine Slow-Roll installation instructions for the full sequence. Keep a screwdriver and tape measure available. This kit does not change the door’s fitment requirements or guarantee a waterproof installation.

Loading customer reviews…

Read reviews of our store

ElkhartRVParts trusted by PROs and DIYs
100% Authentic OEM Parts

Factory-Fresh OEM Parts — the same brands installed in new RVs straight from Elkhart. Genuine, name-brand components made to order — never generic, never outdated. Sourced directly from the original RV manufacturers for perfect fit and factory-level quality.

You may also like

Recently viewed